  • This will be done by running both sedimentation tanks until a floc blanket forms.
  • The turbidity of the effluent will be measured to see what, if any,difference there is between the tanks.  (10/23/08)

Construct weirs:

  • Make a new weir for the plant leveling tank so that it can run at 70 m/day (currently, the holes on opposite sides are interfering with eachothers flow). Trim the current weirs to account for increased flow rates through the plant, so that they will not overflow onto the floor. (10/27/08)

Determine whether or not it is possible to form a floc blanket given the current lamella dimensions we have.

...