Team Members
- Kellie Kress
- Shaina Khan
- Christine Barnett
- Julia Schoen
Goals
Organize Pilot Plant wiki (12/12/08)
...
Fix leaks in plant leveling tank and pipes in order to run tanks. (910/1909/08)
Become familiar with process controller. (9/22/08)
Construct new weirs for the plant leveling tank that allow for parallel tanks to run at flow of 100, 120 and 70 m/day. (9/23Write Midterm Progress Report (10/14/08)
Try to form floc blanket without lamella in second tank to determine if pipe inlet is interfering with blanket formation. (10/519/08)
- This will be done by running both sedimentation tanks until a floc blanket forms.
- The turbidity of the effluent will be measured to see what, if any,difference there is between the tanks. (10/23/08)
Construct new weirs for the plant leveling tank that allow for parallel tanks to run at flow of 100, 120 and 70 m/day. Write Midterm Progress Report (10/1427/08)
Form a floc blanket with lamella in the tank (11/5/08)
- To establish whether or not the there is minimum required tank depth below the lamella for blanket formation.
- Determine how close the blanket can get to what the optimal relationship is between the floc blanket and the bottom of lamella before performance is affected.
- If a sludge blanket cannot be formed with the current tank configuration: 1) what is the minimum height needed and 2) how short can the lamella (vertical distance) before they are ineffective.
...