Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Wiki Markup
h1. Fall 2008 Project: Cuatro Comunidades

As part of the Fall 2008 project work AguaClara is working on designing a water treatment plant with shallower tanks. The full scale pilot facility for this new design will be built in Cuatro Comunidades with the goal of starting construction in September and completing construction by January.

{float:right|border=2px solid black|width=200px}
[{chart:type=bar|width=200|title=Cuatro Comunidades|attachment=cuatro comunidades funding  complete.png}
{excel:file=Cuatro Comunidades^CuatroComunidadesFundRaising2.xls|sheet=funds}
{chart}|Cuatro Comunidades]
{float}
h2. Fund raising
Our goal is to raise these funds by early fall with most of the funds in place by the end of September. The community, Cuatro Comunidades, has committed to contributing approximately $9,000 toward the project. Send tax deductible contributions to:
AguaClara
220 Hollister Hall
Cornell University Ithaca, NY 14853

h3. Design Drawings
[!CC 1.5 m tanks.png|width=300px!|^CC 1.5 m tanks.png]
[Download Autodesk® Design Review software|http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=4086277] to view the AutoCAD files.
[^Cuatro Comunidades.dwf]

[Initial CAD Drawings| Cuatro Comunidades Initial CAD Drawings]