Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Completed Assignments Fall 2008

Design

Team

Meeting Minutes 1

Proposals

Design

Meeting Minutes 2

Design

MM

Goals

 

AutoCAD AutoCAD Meeting Minutes

MM 1

AutoCAD Goals

 

Automated Chemical Doser

Automated Chemical Doser Minutes

9/4/08

Goals

  Automated Chemical Doser Goals

Automated Flow Control

Automated Flow Control Minutes

MM 1

Goals

  Automated Flow Control Goals

CFD Simulation CFD Minutes

MM 1

CFD Goals

 

Floating Flocs

Floating Floc Minutes

9/14/08

Floating Flocs Goals

 

FCM Chlorine Precipitation

FCM Chlorine Precipitation Minutes

9/4/08

Goals

  FCM Chlorine Precipitation Goals

FCM Linearization and Calibration

FCM Linearization and Calibration Minutes

MM 1

FCM Linearization and Calibration Goals

 

Outreach

Outreach Minutes

9/5/08

Goals

  Outreach Goals

Pilot Plant

  • Tapered Flocculation
  • Sedimentation

Pilot Plant Minutes

9/14/08

Goals

  Pilot Plant Goals

Plate Settler Spacing

Plate Settler Spacing Minutes

MM 1

Plate Settler Spacing Goals

 

Tube Flocculator Tube Flocculator Minutes

MM 1

Goals

Tube Flocculator GoalsFloc Fall 2008 Goals]