Pilot Plant Flocculator Goals

Fall 2008 Team Members

  • Christine Barnett
  • Julia Schoen
  • Henry Zeng

Fall 2008 Goals

Resetting Tube Flocculator (9/4/08)

Become familiar with plant set-up and create semester goals (9/11/08)

Start up tube flocculator with vacuum pump (9/19/08)

  • Repair leaks in the pilot plant system so that the plant can run in order to run tube flocculator.

Write Midterm Report (10/21/08)

Compare results from the uniform and non-uniform baffle configuration results from the flocculation tank (11/12/08)

  • Baffles had to be reconifgured to the correct arrangement.
  • Correct spacing between the baffles had to be determined.

Create floc profile for tube flocculator (11/20/08)

  • The turbidity of the flocculator will be measured at various points along the flocculator.
  • A profile similar to the one measured for the tapered flocculator will be made. Gtheta for maximum floc size will be determined.

Measure settling velocity of flocs in the tube flocculator with FRETA (12/1/08)

  • Compare laboratory results with raw water readings from the Pilot Plant using FRETA.

Prepare final presentation and report (12/12/08)