Cuatro Comunidades: Los Bayos, Rio Frio, Aldea Bonito and Las Jaguas

Wiki Markup
{float:right|border=2px solid black|width=240px}
[!4communities plant.JPG|width=240px!|http://picasaweb.google.com/CUAguaClara/CuatroComunidadesConstruction#]
h5. AguaClara water treatment plant at Cuatro Comunidades
{float}
Cuatro Comunidades Plant Operating Data
In the Fall 2008 the AguaClara team designed a water treatment plant with shallower tanks that doesn't need an elevated platform for the plant operator. The full scale pilot facility for this new design was built for the four communities of Los Bayos, Rio Frio, Aldea Bonito and Las Jaguas. Construction was completed in March 2009. The inauguration of the plant was held on June 6, 2009.

Detailed Progress of Las Cuatro Comunidades

Read about the weekly progress from our Engineers Abroad.

Wiki Markup
{float:right|border=2px solid black|width=120px}
[!Cuatro Comunidades Water.JPG|width=120px!|^Cuatro Comunidades Water.JPG]
h5. Raw water and treated water from the AguaClara plant at Cuatro Comunidades.
{float}

Training Sessions

Learn about the workshops we gave to ensure the successful transfer of knowledge.

Finances

This project was funded in part by CESAL, Alianza para el Agua some private donations, and of course the community! Cuatro Comunidades contributed approximately $9,000 toward the project in local materials and construction work.

Design Drawings


Download Autodesk® Design Review software to view the AutoCAD files.
Cuatro Comunidades.dwf
Cuatro Communities Preliminary Construction Drawings.dwg
Initial CAD Drawings
Cuatro Comunidades As-Built Details

Cuatro Comunidades Case Study

An evaluative study of the chemical dose controller, flocculator and sedimentation tanks at the plant was performed in the summer of 2009