Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Yinghan Hua's Individual Contribution Page

Fall 2016  Semester Contributions

During this semester I'm a team member in the Prefab 1L/s team. I participated the construction of the sedimentation tank of the 1L/s plant. I was specifically working to help set up the corrugated 3-feet diameter pipe and cut the pipe at an angle of 15 degree. The cut of the pipe was inaccurate and we corrected that by setting up the jig for the pipe again and cutting another time for each half pipe, which made the two pieces of our sedimentation tank around one width of the corrugation on the pipe shorter than the plant which the summer team built. I also worked to analyze the geometry of the base plates of the sedimentation tank and construct the base plates and the jet reverser. We cut the base plates using the calculations of the parameters of the ellipse, but the plates we got the first time cannot fit into the sedimentation tank properly. We figured out that it is because we didn't take into account the space taken by the jet reverser, on which the base plates should be sitting. So we corrected that and did the drawing of the new ellipses again and this time we got the right shape of the ellipse, which can be fit into the sedimentation tank perfectly. After this, we welded the base plates and the jet reverser together at the angle of 60 degree and obtained the structure to be ready to put into the bottom of the sedimentation tank.

...