Prefabrication 1L/s (Prefab)

Excerpt

 

Spring 2016

The goal of the Prefabrication 1 L/s team is to research, test, and determine fabrication methods for the full-scale plant production in Honduras

...

. We

...

also continue to design novel geometries for low-flow sedimentation tanks and flocculators, and refine the integration of the dosing, flocculation, sedimentation, and filtration processes in these smaller plants.

Spring 2016

This semester, we successfully designed and fabricated a 1/9 scale model of the sedimentation tank. Using a We showed that a large, plastic corrugated pipe was a potential low-weight, low-cost solution to traditional concrete tanks and determined that plastic welding was a viable fabrication method for tank construction in Honduras. We also succeeded in testing our sedimentation tank using a pre-existing tube flocculator in the lab , we and cleaned 50 NTU water to meet WHO standards.

...