h5. AguaClara water treatment plant at Cuatro Comunidades
{float}

[

Cuatro

...

Comunidades

...

Plant

...

Operating

...

Data

...


In

...

the

...

Fall

...

2008

...

the

...

AguaClara

...

team

...

designed

...

a

...

water

...

treatment

...

plant

...

with

...

shallower

...

tanks

...

that

...

doesn't

...

need

...

an

...

elevated

...

platform

...

for

...

the

...

plant

...

operator.

...

The

...

full

...

scale

...

pilot

...

facility

...

for

...

this

...

new

...

design

...

was

...

built

...

for

...

the

...

four

...

communities

...

of

...

Los

...

Bayos,

...

Rio

...

Frio,

...

Aldea

...

Bonito

...

and

...

Las

...

Jaguas.

...

Construction

...

was

...

completed

...

in

...

March

...

2009.

...

The

...

inauguration

...

of

...

the

...

plant

...

was

...

held

...

on

...

June

...

6,

...

2009.

Detailed Progress of Las Cuatro Comunidades

Read about the weekly progress from our Engineers Abroad.

Wiki Markup
|^Invitacion de inauguracion 4 comunidades-1.jpg].

h2. [Detailed Progress of Las Cuatro Comunidades]
Read about the weekly progress from our Engineers Abroad.
{float:right|border=2px solid black|width=120px}
[!Cuatro Comunidades Water.JPG|width=120px!|^Cuatro Comunidades Water.JPG]
h5. Raw water and treated water from the AguaClara plant at Cuatro Comunidades.
{float}
h2. [

Training

...

Sessions

...

Learn

...

about

...

the

...

workshops

...

we

...

gave

...

to

...

ensure

...

the

...

successful

...

transfer

...

of

...

knowledge.

...

Finances

This project was funded in part by CESAL, Alianza para el Agua some private donations, and of course the community! Cuatro Comunidades contributed approximately $9,000 toward the project in local materials and construction work.

Design Drawings

Image Added
Download Autodesk® Design Review software to view the AutoCAD files.
Cuatro Comunidades.dwf
Cuatro Communities Preliminary Construction Drawings.dwg
Initial CAD Drawings
Cuatro Comunidades As-Built Details

Cuatro Comunidades Case Study

An evaluative study of the chemical dose controller, flocculator and sedimentation tanks at the plant was performed in the summer of 2009