Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Kadambari's Individual Contribution Page

Spring 2015 Contributions

Ram Pump

Our goal this semester is to conduct a theoretical analysis of the current system and brainstorm ideas for [easier] fabrication of the pump. The latter will include an alternative to the current method of joining the two valves, as well as, establishing a system for spring manipulation. After doing so, we will run the pump for extended periods of time such that we can establish a comprehensive method for determining optimal spring length depending on certain variables, check for wear points, determine ease of repair, as well as, evaluate the status of the ram pump in terms of a permanent component of the AguaClara plant.

Fall 2014 Contributions 

Ram Pump

...