FabricationOverviewThe Fabrication Team was created in the Spring 2011 semester to solve some of the problems of constructing plant parts onsite in Honduras. We work on better methods for drilling, cutting, and fitting parts, as well as improving designs to make fabrication simpler. We also work on several entrance tank problems, such as deigning a trash rack for large debris and an overflow weir so that water can bypass the plant without turning off the transmission line. |