Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Wiki Markup
{html}
HTML
<iframe width="640" height="480" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" src="http://maps.google.com/maps/ms?ie=UTF8&amp;hl=en&amp;source=embed&amp;msa=0&amp;msid=110542407673596586366.000478476c294e1ba9b51&amp;ll=14.349548,-86.594238&amp;spn=5.107334,7.03125&amp;t=p&amp;z=7&amp;output=embed"></iframe><br /><small>View <a href="http://maps.google.com/maps/ms?ie=UTF8&amp;hl=en&amp;source=embed&amp;msa=0&amp;msid=110542407673596586366.000478476c294e1ba9b51&amp;ll=14.349548,-86.594238&amp;spn=5.107334,7.03125&amp;t=p&amp;z=7" style="color:#0000FF;text-align:left">AguaClara in Honduras</a> in a larger map</small>

Read AguaClara Engineer Progress Reports.
List of Candidate communities.
APP Technician Reports
Validacion de ccc SANAA

location

Partner

Construction begins

inauguration date

population served

design flow (L/s)

1. Ojojona

APP

June 2006

January 2007

2000

6

2. Tamara

APP

January 2008

June 15 2008

3500

12

3. Marcala

IRWA

Fall 2007

July 2008

5500

30

4. Cuatro Comunidades

APP

October 2008

March 2009

2000

6

5. Agalteca

APP

October 2009

June 18, 2010

2160

6

6. Marcala El Chiflador 2

APP/ACRA

November 2010

 

3500

22

Alauca

APP

pending

 

 

12

Atima

APP

pending

 

 

16

Gracias, Lempira

APP

pending

 

10,000

100

Comayagua

APP

pending

 

 

 

Siguatepeque

APP

pending

 

 

 

Jalaca

APP

pending

 

 

 

Los Plancitos Santa Rosa de Copan

APP

pending

 

 

10

Santa Rita

APP

pending

 

 

 

...

{html}
Read [AguaClara Engineer Progress Reports].
List of [Candidate communities].
[APP Technician Reports]
[Validacion de ccc SANAA]
{include|project site list}

During January the Cornell [team travels to Honduras|Team trips] to visit the project sites.