...
Design (15-20) in Accel
- Structure
Research Challenges
- Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
- Foam Filtration (4) in B63 on right end of bench top
- Plate Settle Spacing (3) in B60
- Chemical Dose Controller (3) in B60: one team members as joint member of Design team
- Sedimentation (3)
- Turbidimeter (3)
- Fabrication (4)
- Water Pump (3)
- Stock Tank Mixing (3)
- LFOM (1-2) (Linear Flow Orifice Meter)Structure
(estimated number of students per team)
Team organization survey
Include Page |
---|
| AGUACLARA:Challenges Outreach Spring 2011 |
---|
| AGUACLARA:Challenges Outreach Spring 2011 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Design Spring 2011 |
---|
| AGUACLARA:Challenges Design Spring 2011 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Structure Spring 2011 |
---|
| AGUACLARA:Challenges Structure Spring 2011 |
---|
|
Research Challenges
...
Include Page |
---|
| AGUACLARA:Challenges LFOM Spring 2011 |
---|
| AGUACLARA:Challenges LFOM Spring 2011 |
---|
|
Include Page |
---|
AGUACLARA:Challenges Structure Spring 2011 | AGUACLARA:Challenges Structure Spring 2011 |
|