...
Design (15) in Accel
Inlet Manifold (4) in B60
Tube Floc (4) in B60
Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
Foam Filtration (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)
...
Include Page |
---|
| AGUACLARA:Challenges CDC Chemical Dose Controller Spring 2011 |
---|
| AGUACLARA:Challenges CDC Chemical Dose Controller Spring 2011 |
---|
|
Include Page |
---|
| AGUACLARA:Outreach Challenges for Spring 2011 |
---|
| AGUACLARA:Outreach Challenges for Spring 2011 |
---|
|