Spring 2011 Challenges
Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)
...
Include Page |
---|
| AGUACLARA:Challenges Inlet Manifold Sedimentation Spring 2011 |
---|
| AGUACLARA:Challenges Inlet Manifold Sedimentation Spring 2011 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges ANC Spring 2011 |
---|
| AGUACLARA:Challenges ANC Spring 2011 |
---|
|
...