Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

PSS Fall 2010 Detailed Task List

Fall 2010 Biweekly Report

A Detailed Task List was created to lay out the planned research for the team for Fall 2010.

Reflection Report I Report I provides a detailed description of the planned research and what we think is the game plan in order to scale the apparatus.
Reflection Report II Report II provides a sketch of what the improved apparatus will look like (using two chemicals and pulleys to control the entrance tank float)