09-Feb-08

Resize openings between flocculator sections

11-Feb-08

Begin running current set-up

18-Feb-08

Preliminary Data Collected, Insulation added to Outside of Settling Tubes

25-Feb-08

Comparative Data: Before/ After adding insulation to Settling Tubes

...

Gantt Chart

Pictures

Past Research

In the Spring '07 semester, the pilot plant was designed and constructed.

...