Challenges for Spring 2009

Subteam Leader: Heather Reed

Number of team members needed: 10-15

Important team member skills:

  • CEE 4540
  • CEE 3310
  • Familiarity with AutoCAD & MathCAD
    These skills are helpful but not 100% necessary. We're willing to train new members!

Challenges

Flocculator

  • Continue the development of the horizontal flocculator for large flow rates
  • Add capability for user to specify the height of the sed tank to take advantage of elevation gradientt
  • Draw the drain valves

Sedimentation Tank

  • Code algorithm for sizing the new inlet weir
  • Draw the new weir in AutoCAD
  • Change the old distribution slopes to be solid concrete walls
  • Change the sedimentation tank drain
  • Include the sed tank drain valves

Inlet and Exit Weir Tanks

  • Code the waste channel along the inlet channel of the sed tank
  • Extend the inlet and exit weir pipes and draw complete drainage system
  • Draw caps on inlet and exit weir pipes

Entrance Tank and Rapid Mixer

  • Create AutoCAD code to draw the rapid mix pipe
  • Develop algorithm to determine elevation of entrance tank
  • Fix algorith so entrance tank moves depending on the entrance into the flocculator