Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The pilot plant project started when the spring 2007 Aguaclara team built a vertical flow hydraulic flocculator at the Cornell University Water Treatment Plant (CUWFP). The vertical flow hydraulic flocculator was built as a small scale version of those in Honduras. The vertical flow hydraulic flocculator has been used to test the effects of tapered flocculation on floc formation. The project has evolved since the first flocculator was built. There are two sed tanks at the CUWFP, which have been used to test the combination of sludge blankets and lamella to optimize settling. A tube flocculator has also been constructed to examine the behavior of raw water during flocculation. In spring of 2009, an adjustable baffle system was constructed for the hydraulic flocculator to allow testing of many different baffle spacings.

...

Troubleshooting and Maintenance
Problems that members have previously encountered and suggested solutions.

Construction History and Design
How various parts of the pilot plant were built and their design specifications.

Resources
Useful information and links.