Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

Design Team Meeting Minutes

Spring 2009 Minutes

April 17, 2009

Accomplishments
  • Assigned tasks for the Final Wiki Report
    • Master Algorithm Page
      • Reiko: Sed Inlet Slopes
      • Sara: Flocculator
      • Heather H: Sed Drain, Sed Launder
      • Heather R: Inlet Channel, Exit Channel
      • Adela: Fluids Functions, Sedimentation Tank Dimensions
    • Plant Design Page
Metrics
  • Master Algorithm Page
    • Rendered images for each page will be done once the autoCAD code is finished
    • Entrance Tank and User Inputs will be changed later
  • Meeting between Sara, Reiko, and the entrance tank team will be held to figure out how the entrance tank will be designed/dimensioned.
Outcomes
  • Sed Sludge drain changed by Monroe
    • Dimensions calculated using a ratio
    • Amount of head loss determined to be 80%
Issues
  • Basis of design file needs to be edited--eliminate variables no longer used.
  • Drawing commands need to get back to labview
  • What variables do we want the user to have access to?