Fall 2010 Challenges

estimated number of students per team
Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B60BB63 along wall next to the door
Tube Floc (4) in B60AB60
Stacked Filter (6) in B60BB63 along window: two team members as joint members of Design team
Foam Filter (4) in B60BB63 on left end of bench top
Plate Settle Spacing (4) in B60AB60
Chemical Dose Controller (6) in B60AB60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)

Team organization survey

Include Page
Challenges Design Fall 2010
Challenges Design Fall 2010
Include Page
Challenges Inlet Manifold Fall 2010
Challenges Inlet Manifold Fall 2010
Include Page
Challenges ANC Fall 2010
Challenges ANC Fall 2010
Include Page
Challenges Tube Floc Fall 2010
Challenges Tube Floc Fall 2010
Include Page
Challenges Stacked Filter Fall 2010
Challenges Stacked Filter Fall 2010
Include Page
Challenges Foam Filter Fall 2010
Challenges Foam Filter Fall 2010
Include Page
Challenges PSS Fall 2010
Challenges PSS Fall 2010
Include Page
Fall 2010 CDC Development
Fall 2010 CDC Development
Include Page
Outreach Challenges for Fall 2010
Outreach Challenges for Fall 2010