Fall 2010 Challenges
estimated number of students per team
Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B60BB63 along wall next to the door
Tube Floc (4) in B60AB60
Stacked Filter (6) in B60BB63 along window: two team members as joint members of Design team
Foam Filter (4) in B60BB63 on left end of bench top
Plate Settle Spacing (4) in B60AB60
Chemical Dose Controller (6) in B60AB60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)
Team organization survey
Include Page |
---|
| Challenges Design Fall 2010 |
---|
| Challenges Design Fall 2010 |
---|
|
Include Page |
---|
| Challenges Inlet Manifold Fall 2010 |
---|
| Challenges Inlet Manifold Fall 2010 |
---|
|
Include Page |
---|
| Challenges ANC Fall 2010 |
---|
| Challenges ANC Fall 2010 |
---|
|
Include Page |
---|
| Challenges Tube Floc Fall 2010 |
---|
| Challenges Tube Floc Fall 2010 |
---|
|
Include Page |
---|
| Challenges Stacked Filter Fall 2010 |
---|
| Challenges Stacked Filter Fall 2010 |
---|
|
Include Page |
---|
| Challenges Foam Filter Fall 2010 |
---|
| Challenges Foam Filter Fall 2010 |
---|
|
Include Page |
---|
| Challenges PSS Fall 2010 |
---|
| Challenges PSS Fall 2010 |
---|
|
Include Page |
---|
| Fall 2010 CDC Development |
---|
| Fall 2010 CDC Development |
---|
|
Include Page |
---|
| Outreach Challenges for Fall 2010 |
---|
| Outreach Challenges for Fall 2010 |
---|
|