  • Fixed pipe frame
  • Fixed launders
  • Working on making the walls of the inlet chimneys the same thickness as the inlet channel walls. This will allow for much easier construction.
  • Worked on our teach in
  • Developed a new protocol for testing and committing files to the source forge, as well as a new protocol for committing new files to the Design Tool
  • Worked on developing a protocol for users to submit any bugs they find with the Design Tool
  • Moved the floc tank edits to the most recent design file so that they took effect
Issues
  • Need to better develop bug report on source forge
  • Need to clean up the source forge

...

Floc Hopper Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action
  • Determined the most effective parameters for the floc hopper (such as height, width, length) that should allow the floc hopper to fit various geometries of different plants.
  • Revised the MathCad code defining the parameters of the floc hopper.
  • Developed a first draft of the MtoA code for the floc hopper.
  • Added the wedge command to the MtoA translators
Issues
  • Need to add a few variables to the Variable Naming Guide.
  • Must determine the best placement of the floc hopper in various plants.
  • Will test our code with various plant sizes until we determine the best placement for the floc hopper.
Goals for upcoming week
  •  Finish the MtoA code for the floc hopper, so that the floc hopper can be drawn in with the rest of the plant.
  • Document the floc hopper on the wiki, which may include creating a new "floc hopper design program" on the Automated Design Algorithms page.

...

Materials List Group

Accomplishments
  •  Completed volume and materials calculations for exit channel, inlet channel and , sludge drain. Began working on flocculator and entrance tank calculations and dimensions. Also calculated volume of sedimentation tank manifold entrance.
Issues
  • , floc tank and baffles
  • Also worked on calculations and dimensions for entrance tank and sedimentation tank (tank, inlet slopes, lamella)
  • Began work on piping components
  • Met with Monroe to learn about more intricate components of the plant
Issues
  • Need to determine best way to count up lengths of different size pipes needed
  • Determine the best dimensions to give for different materials (volume vs. surface area, etc.)
  • Difficult and unresolved issues
  • Plans for action
Goals for upcoming week
  • Complete piping calculations
  • Compile all calculations to determine total materials
  • Update Variable Naming Guide

Exit Channel Group

Accomplishments

...

  • Finish documentation
  • Begin work on another Design Team Goal

...

Floc Tank Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action
  • Began working on the exit port for the flocculator.
Issues
  • This port must also be coordinated with the baffle spacing and location, and is connected to the sed tanks.
Goals for upcoming week
  • Understanding how the floc tank and sed tank codes describe this port that they share; writing the design and MtoA code to draw in this port.

...