Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Mon 6/21

Meeting: How to Upload Word Files to the wiki, Reflection Reports, and Detailed Task List

Tues 6/22

Extension: Detailed Task List due by 5 PM as a word doc e-mailed to the Team Leader

Mon 6/21 - Wed 6/23

Schedule an intensive meeting with a Research or Design Leader to learn more about your experimental apparatus, software, and/or coding and data analysis
Conduct a second experiment if you are on the research team unless otherwise specified

Thurs 6/24 - Fri 6/25

For new research team members: Schedule and take a Research Quiz with a Research Leader and your team leader
Work on Reflection Research Reports as a team utilizing the template available

Fri 6/25

Reflection Research Reports for research or Summary Reports for design due at 5 PM as a word doc e-mailed to the Team Leader
Revised Detailed Task List due by 5 PM on the wiki and in the Reflection Research Reports
Remember to use the AguaClaraClean macro before submission

...

Mon 6/28

Meeting: Reflection on Reflection Reports and Summary Reports and AguaClara work

Mon 6/28 - Fri 7/2

Continue to work on design or research
Schedule meeting with a Design or Research Leader to help if needed
Begin to work on your teach ins

Fri 7/2

Summary Reports for design due at 5 PM

Week 4

Mon 7/5

Holiday

Tues 7/6 - Fri 7/10

Continue to work on design or research
Work on your Reflection Research Reports utilizing the appropriate template

Fri 7/10

Reflection Research Reports due 5 PM
*Summary Reports for design due at 5 PM*
*Midterm Peer Evaluation Form* due by 5pm

Week 5

Mon 7/12

Meeting: Automated Design Tool Team, Chemical Dose Controller, ANC Control, and Laminar Tube Floc teach ins

Mon 7/12 - Fri 7/16

Continue to work on design or research

Fri 7/16

Summary Reports for design due at 5 PM

Sat 7/17

Picnic details TBD

...

Mon 7/19

Meeting: Foam Filtration, and Stacked Rapid Sand Filtration teach ins

Mon 7/19 - Fri 7/23

Continue to work on design or research

Fri 7/23

Reflection Research Reports due 5 PM
*Summary Reports for design due at 5 PM*

Week 7

Mon 7/26

Meeting: Plate Settler Spacing teach-in
Monroe talks about Honduras, Guatemala and progress for AguaClara

Mon 7/26 - Fri 7/30

Final Presentation in Hollister 201 for all Research and Automated Design Tool Teams

Sun 8/1

First draft of wiki is Comments about Final Presentation are handed back

Week 8

Mon 8/2

Meeting: AguaClara Engineers: Sarah Long and Dan Smith update Team from Honduras
Review of first drafts of final reports

Mon 8/2 - Thu 8/5

Troubleshoot and add necessary code, experiments, and design to improve your final reports
Revise your final report

Wed 8/4

Outline for Final Reports due by 5 PM

Fri Sat 8/67

First draft of Final Wiki Update are due by 12 Re-submit your final report by 5 PM

Sun 8/8

Comments for Final reports Report 1st Draft are handed back with final grades

Week 9

Mon 8/9 - Tue Tues 8/10

Review the Wiki Organization Guide for help with formatting as you revise the Final Wiki Update

Wed 8/11

2nd Draft Final Report due by 12 PM

Fri 8/13

2nd Draft Final Report is handed back with comments
Upload your final report onto the wiki
Update your individual page

...

Detailed Task List 10 %
Teach-Ins 5 %
Final Presentation 5 %
Final Report 1st Draft 10 %
Final Report 2nd Draft 10 %
Uploading and Formatting Wiki 5 %
Participation, Team Work, and Evaluations 25 %

For Research teams: Reflection Research Reports 3 x 10% = 30 %
For Automated Design Tool teams: Summary Reports 6 x 5 % = 30 %