Leah Buerman's Individual Contribution Page

Info

Image AddedImage Removed
Meng student in Biological and Environmental Engineering
Plant Inflow System , Dec. 2008
Research team member working with the Automated Chemical Doser and Pilot Plant Inflow System and focusing on the Linear Flow Orifice Meter.

Semester Fall 2008 Contributions

This semester Fall 2008 is my last semester with the AguaClara team. I have been focused on perfecting the FLOM design techniques by re-evaluating the intital data that the mathcad code is based on. I spent a good amount of time reading on the internet and trying to understand how and why the Sutro weir, linear-proportional weir, works. The website for the is available on the wiki sutro wier research pageand provides a very helpful discussion of the sutro weir. From that paper and the CEE 454 slides I created an equations page for the sutro wier, available here. The format of eqautions was very difficult for me to figure out, it took several attempts but I now have a strong grasp of the process. This semester I have documented portions of the mathcad code, in order to improve the efficiency of project turn-around. The documentation pages for weir design and flow rate through weir are completed. Also I completed my teach-in this semester and the link for the presentation can be found here. For the rest of the semester I hope to test the overflow situation and complete the paper.working to finish up my research on the Linear Flow Orifice Meter, LFOM. This semseter I conducted research into the assumptions and constraints concerning the Sutro Weir, in order to effectively mimic the Sutro Weir one must have a thorough understanding of the Sutro Wier. The research is available on the sutro wier research page. This semester I also conducted an experiment on the point of failure for the LFOM. The LFOM riser pipe diameter is currently based solely on stability, the point of failure experiment evaluated results of overloading the system. It was hypothsized that at each diameter riser pipe has a maximum flow rate that it can accomodate and when the flow rate through the LFOM exceeds that value then the water will back up in the riser pipe. The results were contrary to the hypothesis and further research is needed. Also this semseter I worked on updating the code that creates the LFOM design for the water treatment plants. there were several issues to pursue in code, the questions are addressed on the LFOM Entrance Tank Code Page. The new code calculates the optimal diameter of the orifices based on the area required for the orifices in the top row of the LFOM the information is available on the Linear Orifice Flow Meter Entrance Code Documentation and Drill size Determination Page . I also documented the code that creates a sutro weir, created by Monroe, available here. The final posting was the set of LFOM designs for pre-set flow rates. This can ensure quality designs for immediate implementation (having a LFOM designed for a larger flow rate than necessary doesn't have a detrimental effect), this is available on the LFOM preset designs page.