Plate Settler Spacing Team

Fall 2008 Goals

Continuing outside research and designing system Sept 15-19th
  • At this point we will continue to look for papers written on plate settler spacing as well as the parameters that determine the limiting factors when decreasing the spacing
  • Modifications to the apparatus are being made to improve upon the summer apparatus used
  • Instead of placing the entire settling column at a 60 degree angle a vertical settling column will be used with only plate settlers at an angle
  • We will be looking at the necessary conditions to form a stable floc blanket
  • The flocculator and sedimentation column and all necessary components of the set up will fully operable and experimentation will begin
Determine tube diameters to be tested 9/15-10/2

...

Establish a preliminary sketch of apparatus and collaborate with Paul, Matt, Ian, and Professor Weber-Shirk regarding apparatus 10/2
Order materials 10/2
Document experimental apparatus 10/2-

...

end of semester
  • Pictures, diagrams, and explanations
  • Document any improvements made throughout the semester
Build experimental apparatus 10/2-10/24

...

  • Learn how to create and control floc blankets
  • Assess quality of system: steady flows, process control readings, water level in clay/water bucket
Run experiment 11/1-

...

12/

...

2
  • Three good Run three trials for each tube diameter

...

  • spacing for a period of two days for each trial
  • Collection of data using process controller
Data analysis and preparation of results 11/21-12/5
Create new experiment 11/15-end of semester
  • Based on results from experiment, determine next course of action: run more of the same experiment, test new diameters, vary flow rates, vary something else?

______

Continuing outside research and designing system Sept 15-19th

  • At this point we will continue to look for papers written on plate settler spacing as well as the parameters that determine the limiting factors when decreasing the spacing
  • Modifications to the apparatus are being made to improve upon the summer apparatus used
  • Instead of placing the entire settling column at a 60 degree angle a vertical settling column will be used with only plate settlers at an angle
  • We will be looking at the necessary conditions to form a stable floc blanket
Find and order Sedimentation material by Sept 19
  • A new sedimentation material will be used to replace the straws as plate settlers
  • We are looking for a material that comes in one cohesive piece instead of many parts like the straws
Have a testing model by Sept 22
  • By this date we will have a complete system to test and begin running with process controller
Final working model will be up and running, and we will have our teachin Sept 30,

...

Next Semester Challenges