Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

I was a member of the Coagulant Management team for the Spring 2013 semester. My main contributions involved the centrifugal pump. I reviewed old designs and created new ones to make the previous designs more clear. Through my designs, the team was able to purchase the materials necessary for the fabrication of the pump and begin building it. I also proposed testing the pump with corn syrup and food dye so that the direction of the flow could be easily seen and recorded.

Summer 2013 Contributions

I was a member of the Ram Pump team for the 2013 Summer internship program. I contributed to the ram pump by helping to repair leaks and designing a more efficient waste valve. I helped preform tests and discussed with my team about how to interpret the results. I also helped construct a new drive system that would allow for the team to test a wider variety of drive flows.

Fall 2013 Contributions

As a member of the Ram Pump team for the Fall 2013 semester, I assisted the new team in becoming familiar with the ram pump. I gave detailed explanations on the research that had been done over the summer as well as suggestions for further research. I also helped design and construct a new apparatus for testing the ram pump.