Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

  • Collaboration with hydraulic design
  • Modification of the of launderer design program.
  • Calculating the affects of the additional sedimentation tank.

Leslie is working to determine the baffle spacing in tank A of the Marcala plant.
Subtasks include:

  • determining the acceptable G and Gtheta values in the tank
  • determining whether a surge tank is needed in order to protect the first baffle from the force of the water entering the tank