  • Caulked holes from previous baffle layouts for 32 baffles to allow for reuse on secondary baffle system setup
  • Drilled holes and cut baffles according to Adjustable Baffle System design
  • Cut Pex tubing as spacers for secondary baffle system
  • Assembled secondary baffle system
Outcomes
  • Completed baffles for secondary baffle system to which when system is complete will allow for one system to be adjusted while another system is in the tank being tested

...

  • Calculated range of energy dissipation rates for various non-tapered baffle spacings (b)
Metrics

...


Wiki Markup
{float:left}
h6. Equation for energy dissipation:
!energydissform.JPG!
{float}


Q = 100 L/min
K. baffle = 4
Π . cell = 14
w = 12 in.305 m
b = various spacings (inm)

b (inm)

ε (mW/kg)

2" .0051

49 12.099 275

3" .076

9 2.699 425

4" .102

3 .069 767

5" .127

1 .257 314

6" .152

0.606 152

7" .178

0.327 082

8" .203

0.192 048

Outcomes
  • Have range of values of spacings to be tested with adjustable baffle system to find an optimal energy dissipation rate. With both sets of baffles done and a range of dissipation rates to test we can turn on the plant and begin taking turbidity profiles.

Working Group 3

Accomplishments
  • Begun addressing issues of organization from midterm wiki feedback
  • Begun overall reorganization/recombination of redundant pages
Outcomes
  • Pilot Plant wiki space is gradually becoming more organized