Friday, March 27
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
Metrics
- Quantitative and qualitative results from accomplishments and outcomes.
- Potential metrics for unresolved issues.
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Variable Naming Guide has been updated
- Monroe has made changes to the VNG where descriptions will be given in different languages
- Ecuador and Gracias designs are updated and complete with the new changes
- Designs submitted to each party
Outcomes
- MathCAD codes are almost complete and enough is done to start updating the AutoCAD codes
- Next step is to put everything online (Monroe with Labview) and get AutoCAD working
- Start of automated Materials List will be created parallel to updating AutoCAD and MathCAD codes (by Reiko & Adela)
- Question for engineers: Is it more important to have area or volume for the walls?
Issues
- Descriptions need to be made clear & concise for the VNG
- Algorithm for valve sizes needs to be included and drawn
- Floc hopper drain program still not complete
- Sludge drain dimensions needs to be changed--height to width ratio?
- Flocculator baffle code needs to be updated--what is the ideal number of baffles for a channel?
- Flocculator needs to be able to be drained--add ports to the bottom of the baffles, add ports with flaps, or add drain similar to the sludge drain?
Division of tasks can be found here.
Organization of [codes|
...