Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

Chemical Doser Design

Wiki Markup
h1. Chemical Doser Design
{float:right|border=2px solid black|width=260px}
[!Laboratory Research Set-ups^Labeled Robust ACD freestanding F08 2.JPG|width=260px!|Laboratory Research Set-ups]
{float}

The

...

chemical

...

doser

...

(CD)

...

has

...

three

...

principle

...

components:

...

a

...

float,

...

a

...

lever

...

arm,

...

and

...

a

...

flow

...

controller

...

(FC).

...

The

...

float

...

currently

...

used

...

in

...

the

...

lab

...

for

...

data

...

collection

...

is

...

a

...

45.5

...

cm

...

long

...

4

...

in

...

PVC

...

tube

...

capped

...

at

...

both

...

ends

...

and

...

partially

...

filled

...

with

...

sand

...

so

...

that

...

it

...

weighs

...

8

...

lbs.

...

It

...

rests

...

33.5

...

cm

...

below

...

and

...

12

...

cm

...

above

...

the

...

water

...

line

...

in

...

a

...

virtual

...

grit

...

chamber,

...

which

...

is

...

a

...

deep

...

bucket

...

with

...

a

...

pressure

...

sensor

...

at

...

its

...

base.

...

This

...

pressure

...

sensor

...

provides

...

readings

...

of

...

the

...

water

...

level

...

in

...

the

...

bucket.

...

The

...

float

...

is

...

connected

...

via

...

low-elasticity

...

fishing

...

line

...

to

...

the

...

lever

...

arm.

...

The

...

lever

...

arm

...

is

...

a

...

68

...

cm

...

length

...

of

...

1

...

1/4

...

in

...

schedule

...

40

...

PVC

...

pipe

...

with

...

a

...

pivot

...

point

...

at

...

34

...

cm

...

(the

...

center).

...

Opposite

...

of

...

the

...

pivot

...

there

...

are

...

notches

...

cut

...

into

...

the

...

pipe

...

at

...

5

...

cm

...

length

...

intervals.

...

The

...

chemical

...

doser

...

hangs

...

from

...

these

...

notches.

...


A

...

1

...

1/2

...

in

...

schedule

...

40

...

PVC

...

pipe

...

attached

...

to

...

a

...

flange

...

base

...

holds

...

up

...

the

...

lever

...

arm.

...

Wiki Markup
{float:left|border=2px solid black|width=260px}
[!Laboratory Research Set-ups^IMG_7246.JPG|width=260px!|Laboratory Research Set-ups]
{float}

...


The

...

top

...

of

...

the

...

pipe

...

is

...

cut

...

in

...

a

...

saddle

...

shape

...

to

...

fit

...

the

...

lever

...

arm

...

through

...

it

...

and

...

create

...

the

...

pivot.

...

The

...

height

...

of

...

this

...

base

...

pipe

...

depends

...

on

...

the

...

design

...

constraints

...

of

...

the

...

plant

...

it

...

will

...

be

...

built

...

for.

...

The

...

FC

...

should

...

be

...

attached

...

to

...

the

...

base

...

pipe

...

with

...

two

...

clamps

...

that

...

are

...

interconnected

...

so

...

that

...

they

...

firmly

...

anchor

...

the

...

FC

...

at

...

the

...

appropriate

...

height

...

for

...

zeroing

...

the

...

CD

...

.

...

Only

...

one

...

clamp

...

was

...

used

...

during

...

experimental

...

testing

...

because

...

the

...

FC

...

was

...

being

...

continually

...

checked

...

and

...

re-zeroed,

...

and

...

it

...

was

...

being

...

used

...

in

...

a

...

very

...

controlled

...

environment.

...

Additional

...

clamps

...

would

...

be

...

necessary

...

for

...

robust

...

plant

...

operation.


Wiki Markup


\\

{float:right|border=2px solid black|width=260px}
[!Laboratory Research Set-ups^IMG_7243.JPG|width=260px!|Laboratory Research Set-ups]
{float}

The

...

chemical

...

dosing

...

tube

...

is

...

a

...

tube

...

with

...

an

...

open

...

T

...

connection

...

at

...

the

...

top,

...

which

...

allows

...

the

...

FC

...

outflow

...

tubing

...

to

...

drain

...

through

...

a

...

pressure

...

break

...

T.

...

The

...

tubing

...

exiting

...

the

...

pressure

...

break

...

T

...

has

...

a

...

larger

...

diameter

...

than

...

the

...

tubing

...

entering

...

it.

...

The

...

pressure

...

break

...

and

...

larger

...

outflow

...

tubing

...

allow

...

a

...

free

...

surface

...

at

...

the

...

same

...

height

...

as

...

the

...

discharge

...

to

...

the

...

rapid

...

mix

...

(minus head loss) to

...

form

...

inside

...

the

...

larger

...

tube

...

while

...

air

...

can

...

also

...

flow

...

through

...

the

...

tube.

...

Currently

...

¼

...

inch

...

outer

...

diameter

...

tubing

...

is

...

used

...

to

...

connect

...

the

...

flow

...

controller

...

to

...

the

...

pressure

...

break

...

T,

...

but

...

it

...

is

...

not

...

known

...

what

...

size

...

tubing

...

is

...

necessary

...

to

...

allow

...

air

...

to

...

flow

...

after

...

the

...

T.

...

Experience

...

has

...

indicated

...

that

...

½

...

inch

...

outer

...

diameter

...

tubing

...

is

...

large

...

enough,

...

but

...

it

...

is

...

possible

...

that

...

tubing

...

with

...

an

...

outer

...

diameter

...

as

...

small

...

as

...

3/8

...

inch

...

could

...

work

...

as

...

well. The larger tube is then connected to 1/4 in outer diameter tubing, which connects the CD to the rapid mix. It is unclear if this final connection is needed, though, and it may be removed so that the larger tubing connects the T to the rapid mix directly.

For laboratory testing, water flows from the bottom of the chemical dosing tube to a plastic column with a pressure sensor at the bottom. This pressure sensor gives readings of water height in the column, which can be converted into flow rates from the FC.