Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

Spring 2011 Challenges

...

Outreach (6-

...

10)

Design (15-20) in Accel

Research Challenges (Matt)

...

...

  • 3) in B60:

...

  • one team members as joint

...

Invent Challenges (Monroe)

...

...


  • (estimated number of students per team)

Team organization survey

Include Page
AGUACLARA:Challenges Outreach Spring 2011AGUACLARA:
Challenges Outreach Spring 2011
Include Page
AGUACLARA:Challenges Design Spring 2011AGUACLARA:
Challenges Design Spring 2011

Research Challenges

Include Page
AGUACLARA:Challenges Stacked Filtration Spring 2011AGUACLARA:
Challenges Stacked Filtration Spring 2011
Include Page
AGUACLARA:Challenges Foam Filtration Spring 2011AGUACLARA:
Challenges Foam Filtration Spring 2011
Include Page
AGUACLARA:Challenges Plate Settler Spacing Spring 2011AGUACLARA:
Challenges Plate Settler Spacing Spring 2011
Include Page
AGUACLARA:Challenges Chemical Dose Controller Spring 2011AGUACLARA:
Challenges Chemical Dose Controller Spring 2011
Include Page
Challenges Sedimentation Spring 2011
Challenges Sedimentation Spring 2011

Invent Challenges

Include Page
AGUACLARA:Challenges Turbidimeter Spring 2011AGUACLARA:
Challenges Turbidimeter Spring 2011
Include Page
AGUACLARA:Challenges Fabrication Spring 2011AGUACLARA:
Challenges Fabrication Spring 2011
Include Page
AGUACLARA:Challenges Water Pump Spring 2011AGUACLARA:
Challenges Water Pump Spring 2011
Include Page
AGUACLARA:Challenges Stock Tank Mixing Spring 2011AGUACLARA:
Challenges Stock Tank Mixing Spring 2011
Include Page
Challenges High Flow Chemical Dose Controller Spring 2011
Challenges High Flow Chemical Dose Controller Spring 2011
Include Page
Challenges Structure Spring 2011
Challenges Structure Spring 2011