Comment: Migration of unmigrated content due to installation of a new plugin

...

  • Caulked holes from previous baffle layouts for 32 baffles to allow for reuse on secondary baffle system setup
  • Drilled holes and cut baffles according to Adjustable Baffle System design
  • Cut Pex tubing as spacers for secondary baffle system
  • Assembled secondary baffle system
Outcomes
  • Completed baffles for secondary baffle system to system which when system is complete will allow for one system to be adjusted while another system is in the tank being tested

...

  • Calculated range of energy dissipation rates for various non-tapered baffle spacings (b)
Metrics

...


Wiki Markup
{float:left}
h6. Equation for energy dissipation:
!energydissform.JPG!
{float}


Q = 100 L/min
K. baffle = 4
Π . cell = 14
w = 12 in.305 m
b = various spacings (inm)

b (inm)

ε (mW/kg)

2" .0051

49 12.099 275

3" .076

9 2.699 425

4" .102

3 .069 767

5" .127

1 .257 314

6" .152

0.606 152

7" .178

0.327 082

8" .203

0.192 048

Outcomes
  • Have range of values of spacings to be tested with adjustable baffle system to find an optimal energy dissipation rate. With both sets of baffles done and a range of dissipation rates to test we can turn on the plant and begin taking turbidity profiles.

Working Group 3

Accomplishments
  • Begun addressing issues of organization from midterm wiki feedback
  • Begun overall reorganization/recombination of redundant pages
Outcomes
  • Pilot Plant wiki space is gradually becoming more organized