...
Date | Class topics and/or work due |
---|---|
Thurs 8/26 | Class: Intro to AguaClara, project scope and overview |
Tues 8/31 | Class: Intro to subteam projects and structure with the subteam leaders |
Thurs 9/2 | Team Training. Design Team meet in Accel Computer Lab (Orange room on second floor) in Carpenter Hall. Research teams meet in Hollister 150. Outreach Team meet in Hollister 366. |
Tues 9/7 | Team Training. Design Team meet in the AguaClara Lab (Hollister B60). Research teams meet in Hollister 150. Outreach Team meet in Hollister 366. |
Thurs 9/9 | Class: Introduction to Wiki Work: meet for class in Blue Accel Computer Lab in Carpenter Library |
Sat 9/11 | 4:30: Tour of Cornell Filtration Plant (Off of Caldwell Road between Plantations Road and Forest Home Drive) |
Tues 9/14 | Team work |
Thurs 9/16 | Team work |
Tues 9/21 | Speaker: Larry Harrington Presentation Slides |
Thurs 9/23 | Team work |
Fri 9/24 | Research Biweekly Report Due by Midnight |
Tues 9/28 | Peace Corps Presentation |
Thurs 9/30 | Team Work |
Fri 10/1 | Design Weekly Update Due by Midnight |
Tues 10/5 | Class: Teach in for Design team Team Work |
Thurs 10/7 | Teleconference with Dan Smith, AguaClara alumnus working as AguaClara engineer in Honduras |
Fri 10/8 | Research Biweekly Report Due by Midnight |
Tues 10/12 | Fall Break: No Class |
Thurs 10/14 | Class: Teach ins for Outreach team and Automated Design Tool team |
Fri 10/15 | Midterm Peer Evaluation Form due by 5pmMidnight |
Tues 10/19 | Class: Teach ins for Outreach, Floc Blanket Research teams Laminar Tube Floc team |
Thurs 10/21 | Team Work |
Fri 10/22 | Research Biweekly Report Due by Midnight |
Tues 10/26 | Class: Teach in for Tube Floc, Plate Settler Spacing followed by Team Work |
Thurs 10/28 | Class: Teach in for Chemical Dose Controller and talk with Sarah Long, AguaClara Engineer |
Fri 10/29 | Design Weekly Update Due by Midnight |
Tues 11/2 | Class: Teach in for ANC Control, Chemical Dose Controller Inlet Manifold teams |
Thurs 11/4 | Presentation: Professor Ken Roberts, Government Professor, speaking about Honduras |
Fri 11/5 | Research Biweekly Report Due by Midnight |
Tues 11/9 | Class: Teach in for Stacked Rapid Sand Filtration, Foam Filtration teams |
Thurs 11/11 | Team Work |
Fri 11/12 | Design Weekly Update Due by Midnight |
Tues 11/16 | Team Work Forum: All students share updates on their research and how their teams are running |
Thurs 11/18 | Team Work |
Fri 11/19 | Research Biweekly Report Due by Midnight |
Tues 11/23 | Team Work |
Thurs 11/25 | Thanksgiving: No class |
Tues 11/30 | Team Work |
Thurs 12/2 | All team discussion |
Fri 12/3 | Peer Evaluations due by Midnight |
Wed 12/8 | Final edited wiki report due by Midnight |
...
Assignment | Weight |
---|---|
Reports (weekly for Design (2.5% each), biweekly for Research (5% each)) | 25% |
Teach In | 15% |
Midterm wiki report | 15% |
Final report and Final Wiki | 25% |
Final presentations | 15% |
Individual effort & contribution (based on individual contribution page and peer evaluation) (as a multiplier) | 100% |
Total: | 100% |