...
Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)
Team organization survey
Include Page |
---|
| AGUACLARA:Challenges Design Fall 2010AGUACLARA: |
---|
| Challenges Design Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Inlet Manifold Fall 2010AGUACLARA: |
---|
| Challenges Inlet Manifold Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges ANC Fall 2010AGUACLARA: |
---|
| Challenges ANC Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Tube Floc Fall 2010AGUACLARA: |
---|
| Challenges Tube Floc Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Stacked Filter Fall 2010AGUACLARA: |
---|
| Challenges Stacked Filter Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges Foam Filter Fall 2010AGUACLARA: |
---|
| Challenges Foam Filter Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges PSS Fall 2010AGUACLARA: |
---|
| Challenges PSS Fall 2010 |
---|
|
Include Page |
---|
| AGUACLARA:Challenges CDC Fall 2010 CDC DevelopmentAGUACLARA:Challenges CDC |
---|
| Fall 2010 CDC Development |
---|
|
Include Page |
---|
| AGUACLARA:Outreach Challenges for Fall 2010AGUACLARA: |
---|
| Outreach Challenges for Fall 2010 |
---|
|