During the Spring 2015 Semester, the Fabrication sub-team is addressing four separate projects. The first is the development is the testing of the weir system, which is oriented towards use in the plant as a way to adjust flow rate through the plant. The development of the weir system and the creation of a scale model were the biggest accomplishments of last semester's Fabrication team. Along with this project, the Fabrication is designing a large-float valve to be used to join and regulate flow from the storage tank to the first main tank in the Aguaclara plant. In addition, the team is looking to create a DOM sensor and a floc hopper probe to be used in Aguaclara plants.For the Spring 2016 semester, the Fabrication subteam has four main objectives. The first is to redesign the OStaRS. In addition, the team will be further refining the design of the floc hopper probe.

The team will also be redesigning the constant head tank to improve chlorine resistance of the tank and to accommodate the larger float valve. Testing of a low cost turbidimeter will also be conducted.The DOM sensor may measure absorbance of a long wavelength (perhaps red) and a short wavelength (blue or UV). The absorbance of the long wavelength light will be a measure of the absorbance due to suspended solids. The absorbance of the short wavelength light will be a measure of the absorbance due to suspended solids plus DOM. The absorbance due to DOM can thus be obtained by subtracting the absorbance of the long wavelength from the absorbance of the short wavelength.

For the Spring 2016 semester, the Fabrication subteam has four main objectives. The first is to redesign the OStaRS. In addition, the team will be further refining the design of the floc hopper probe. The team will also be redesigning the constant head tank to improve chlorine resistance of the tank and to accommodate the larger float valve. Testing of a low cost turbidimeter will also be conducted.

 

Section
Column
Team Members

Serena Takada

Subhani Katugampala

Valerie Shao

Anna Doyle

Miguel Castellanos

Mengqi Jiang


Email Team

Column
Documents

 

Challenges

Task Lists

Symposiums

Final Presentation

Final Report

Spring '16

   Image AddedImage Added

CHT PPT: Image Added

CHT PDF: Image Added

OStaRS PPT: Image Added

OSTaRS Google: Image Added

OStaRS PDF:Image Added

Floc Hopper Probe PPT:Image Added

Floc Hopper Probe PDF: Image Added

Constant Head Tank: Image Added

OStaRS: Image Added

Floc Hopper Probe: Image Added 

Spring '15

  

SRSF Weir Model:

DOM Sensor:

LCLH Float Valve:

Floc Hopper Probe:

 

SRSF Weir Model:

 

DOM Sensor:  

LCLH Float Valve:  

Floc Hopper Probe:

Fall '14 
Summer '12 

Summer '11

 

Spring '11

 

 

Excerpt
hiddentrue

The Fabrication Team was created in the Spring 2011 semester to solve some of the problems of constructing plant parts on-site in Honduras. One goal of AguaClara is to empower Hondurans to be able to build the plant, and the Fabrication team works to make that easier.