Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

...

h2. Details *

Date:

*

Thursday,

September

19,

2008

*


Time:

*

7:00

PM

*


Place

*

:

Hollister

Lab

Attendees

  • Tania
  • Sara
  • Cherish
  • Reiko

Agenda / Minutes

Gracias Design

 Tania, Reiko and Monroe spoke with John to discuss Gracias design. The following are the ideas settled upon:

  • Make entrance tank larger, approx. 1.5 x 3 m
  • Place barrier before the riser rube
  • Eliminate inlet pipes and replace with square concrete channels
  • Decided on a 3 sed. tank double-width design, but create 2 v-channels and containing 2 sets of slopes
    • Basically a 6 sed. tank design, but wall is removed
  • Change floc channel width to be equal to the sed tank width

Design Changes

The settling velocity for the sed tank was determined by Monroe. We need to incorporate that velocity into the design.

Action Items

Table of Content Zone
indent10px
locationtop
typelist
printablefalse

Details

Wiki Markup
Wiki Markup
{dynamictasklist}{dynamictasklist}

h3. Attendees

* Tania
* Sara
* Cherish
* Reiko

h2. Agenda / Minutes


h3. Gracias Design

 Tania, Reiko and Monroe spoke with John to discuss Gracias design. The following are the ideas settled upon:
* Make entrance tank larger, approx. 1.5 x 3 m
* Place barrier before the riser rube
* Eliminate inlet pipes and replace with square concrete channels
* Decided on a 3 sed. tank double-width design, but create 2 v-channels and containing 2 sets of slopes
** Basically a 6 sed. tank design, but wall is removed
* Change floc channel width to be equal to the sed tank width

h3. Design Changes

The settling velocity for the sed tank was determined by Monroe. We need to incorporate that velocity into the design.

h3.


h2. Action Items

{dynamictasklist}