Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

Design Spring 2010 Challenges

...

Subteam Leader: Heather Reed

Number of team members needed: 10-15

Important team member skills:

  • CEE 4540
  • CEE 3310
  • Familiarity with AutoCAD & MathCAD
    These skills are helpful but not 100% necessary. We're willing to train new members!

Challenges

Flocculator

  • Continue the development of the horizontal flocculator for large flow rates
  • Add capability for user to specify the height of the sed tank to take advantage of elevation gradientt
  • Draw the drain valves

Sedimentation Tank

  • Code algorithm for sizing the new inlet weir
  • Draw the new weir in AutoCAD
  • Change the old distribution slopes to be solid concrete walls
  • Change the sedimentation tank drain
  • Include the sed tank drain valves

Inlet and Exit Weir Tanks

  • Code the waste channel along the inlet channel of the sed tank
  • Extend the inlet and exit weir pipes and draw complete drainage system
  • Draw caps on inlet and exit weir pipes

Entrance Tank and Rapid Mixer

...

iFrame
srchttps://docs.google.com/Doc?docid=0AYYN8E8iIf1MZGZjd3B0cnRfM2Z3amJmZmYz&hl=en
width800
height600