Week 9: (10-28-2008 to 11-2-2008)
Members that Attended:
Yamilet
Aditi
Rustom
Reshma
Kevin
Kelly
Tim
Work Completed:
Yamilet has spoken with the manufacturers of the paint that Mujeres Solares uses to see if they could send us some paint and/or some specifications.
Rustom found and scanned two ASTM standards for testing adhesion of paint and other materials.
Kelly created a construction schedule for the box cooker.
We created scaled up dimension drawings for the box cooker, and a list of materials.
Work Planned:
We need to become more familiar with the ASTM tests, decide which to use (or use both) and order any necessary supplies.
We need to come up with a general plan and procedure for our paint testing.
We need to follow the following schedule:
Date | Time | Task to Accomplish |
---|---|---|
11/2/08 | 12:30 -1:30 PM | Wood Preparation |
11/5/08 | 8:00-10:00 PM | Wood Cutting and Assembly |
11/9/08 | 1:00-5:00 PM | Wood Cutting and Assembly |
11/12/08 | 8:00-10:00 PM | Painting |
11/16/08 | 1:00-5:00 PM | Metal assembly and finish on the assembly |
Finish by 11/17/08