Week 9: (10-28-2008 to 11-2-2008)

Members that Attended:
Yamilet
Aditi
Rustom
Reshma
Kevin
Kelly
Tim

Work Completed:
Yamilet has spoken with the manufacturers of the paint that Mujeres Solares uses to see if they could send us some paint and/or some specifications.
Rustom found and scanned two ASTM standards for testing adhesion of paint and other materials.
Kelly created a construction schedule for the box cooker.
We created scaled up dimension drawings for the box cooker, and a list of materials.

Work Planned:
We need to become more familiar with the ASTM tests, decide which to use (or use both) and order any necessary supplies.
We need to come up with a general plan and procedure for our paint testing.

We need to follow the following schedule:

Date

Time

Task to Accomplish

11/2/08

12:30 -1:30 PM

Wood Preparation

11/5/08

8:00-10:00 PM

Wood Cutting and Assembly

11/9/08

1:00-5:00 PM

Wood Cutting and Assembly

11/12/08

8:00-10:00 PM

Painting

11/16/08

1:00-5:00 PM

Metal assembly and finish on the assembly

Finish by 11/17/08