Design Team

...

Meeting Minutes

Spring 2009 Minutes

"Date"

Working Group: 1

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Difficult and unresolved issues
  • Plans for action

Working Group: 2

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Difficult and unresolved issues
  • Plans for action

Friday, March 27

Accomplishments
  • Variable Naming Guide has been updated
  • Monroe has made changes to the VNG where descriptions will be given in different languages
  • Ecuador and Gracias designs are updated and complete with the new changes
    • Designs submitted to each party
Outcomes
  • MathCAD codes are almost complete and enough is done to start updating the AutoCAD codes
  • Next step is to put everything online (Monroe with Labview) and get AutoCAD working
  • Start of automated Materials List will be created parallel to updating AutoCAD and MathCAD codes (by Reiko & Adela)
    • Question for engineers: Is it more important to have area or volume for the walls?
Issues
  • Descriptions need to be made clear & concise for the VNG
  • Algorithm for valve sizes needs to be included and drawn
  • Floc hopper drain program still not complete
  • Sludge drain dimensions needs to be changed--height to width ratio?
  • Flocculator baffle code needs to be updated--what is the ideal number of baffles for a channel?
  • Flocculator needs to be able to be drained--add ports to the bottom of the baffles, add ports with flaps, or add drain similar to the sludge drain?

Division of tasks can be found here.
Organization of [codes|

...