Flocculator Maintenance

Flocculator Maintenance Procedures

Maintenance RepairsConstant communication with the Cornell Water Treatment Plant was needed to attempt to integrate our pilot plant into their facility. Some modifications would be necessary after transportation and set up in the tank at the plant. We fabricated a frame to hold the rapid mix in place on the side of the tank. The inlet pipe had to be redirected to fit into the rapid mix pipe. Directing the inlet pipe directly straight down into the top of the rapid mix pipe would give us the maximum flow from that pipe. The outlet pipe was reconstructed to prevent leakage. Water from the treatment plant is directed to us before treatment. After the water is treated in our system the effluent exits the tank and reenters the treatment plant at the same point through a nearby drain. Assembly and installation of the turbidimeters, sedimentation tubes, and alum feeder were completed in the same day.

Other Resources

Flocculator Research

...