Towards the second half of the semester, I continued optimizing the flocculation code. Additionally, I set up a spreadsheet of different flow rates and different parameters of which to test the Master program for reasonable values for the sedimentation and flocculation tanks.

By taking on more of a role for wrapping up the semester as this is my Master's project, I ran intended to run the automated design code for 5 different flow rates and processed process the autocad files for comparison. Since there were many problems especially at the end of the semester with various references I spent time cleaning out the functions and created 'Beta' functions for each file. These 'beta' files had all the parameters needed in the function directly in the file instead of calling them from many references. Realizing that this was unnecessary, I ended up using Monroe's WWWMasterProgram to run the numbers for two new potential sites.

Overall, I helped with the consolidation of all the programs. Leslie wrote more of the flocculaton code but we both helped brainstormed ways to implement it, even with the help of the AutoCAD team and with Monore. There was a problem with the way the Gtheta was being calculated, and after this was fixed we could run the code. Additionally, through creating the spreadsheet to determine what was wrong, we figured out that placing the baffles into the two channels needed fine tuning. It was decided that at this point we would only code for the case with two channels, although we had aspirations to enhance the code to allow for more channels. At this point teams should focus on more research on further flocculation and expanding the capabilities of the master program. Furthermore, I think it is important to begin to compile a materials list of lamella, elbows, and pipe sizes needed for the construction of the plant.

Other work I contributed to was the internal design process which I coordinated, you can see details of who worked on what code here.

As far as the final algorithm and final report for the unit processes team, I only reviewed what Leslie completed. I went through all the WIKI pages and updated links and continued to follow through with minutes for our team. (Note: Many other meetings were not recorded with we worked alone!) I also went through where all the variables were listed to ensure they all matched up.

The final presentation was a group effort, but I took the lead on bringing the team all together. It was frustrating because some of the code on the hydrualic team was not working immediately and delayed our further perfecting our final presentation. I think overall I continued my role as a UP team leader by more managing my teammates, but truth be told, they were excellent to work with and did not need much guidance from myself!

I will continue to work with Monroe as much as I can through the summer and hope to plan an awareness event in NYC before taking off to spend the year in Honduras!