Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Figure 1: Chosen hinged design for closeable flap (5/18/2017)

 

Figure 2: The constructed module in the flume before testing (5/18/2017)

 

Figure 3: Leakage rate as a function of gap size (5/18/2017)

 

 

 

Section
Column
Team Members

Alexandria King

Tanvi Naidu

Matt Cimini

Column
Team Documents

 

Challenges

Tasks

Teach-In

Presentation

Final Report

Spring '17

 

FTTFC Task List Spring 2017.pdf

 

FTTFC Spring 2017

 

Column
Past Research

None.