The team successfully designed and tested a weir module to meet the identified criteria. The testing was conducted in DeFrees Hydraulics lab against a 20 L/s flow rate. The test verified calculations made for modifications to the previous design, which will improve ease of constructability and operation. Reducing leakage is an area that requires improvements and could benefit from further exploration. The team used slit rubber tubing as a gasket, which had some effect on reducing leakage, however a rubber-sheet gasket could be much more effective. This would increase the allowance for gap size given an acceptable maximum leakage rate.

 

Figure 1: The constructed module in the flume before testing

Image Added

 

Figure 2: Leakage rate as a function of gap size

Image Added

 

 

 

Section
Column
Team Members

Alexandria King

Tanvi Naidu

Matt Cimini

Column
Team Documents
name

250

 

Challenges

Tasks

Teach-In

Presentation

Final Report

Spring '17

 

View file

FTTFC Task List.pdf

height

 

FTTFC Spring 2017

 

Column
Past Research

None.