Lilly Mendoza's Individual Contribution Page
Subteam: EStaRS
Fall 2015
...
Contributions
This semester 's goals are to revise the team was able to revise lab set-up, lab scale fixing to prevent leakage, and begin initial testing of new inlet system that replaced slotted pipes with orifices. Testing still continues to determine the new inlet systems effectiveness and whether revision is needed. Also, testing will be ongoing to ensure the filter runs at the design flow rate and outputs influent water at low turbiditydifferent methods are being used to determine if the bed is fluidized during backwash and new equipment was added to read turbidity and headloss.
Spring 2015 Contributions
...