...
| B60 | B62 | 160 | 150 | Project Space |
Basic Tools | Drawer to left of sink | Drawer in center of countertop | Drawer to right of right sink | -- | Red tool box to left of entrance dooracross from the blue cabinets |
Specialty Tools | Drawer to left of sink | -- | -- | ---- | Red tool box across from the blue cabinets |
Tubing | Cabinet to right of sink | -- | Drawer to right of sink | -- | White drawer drawers to left of entrance door |
Push to Connect Fittings | Filing unit on left side of room | -- | Drawer to right of sink | -- | Black and yellow drawers filing cabinets to left of entrance door |
Barbed Fittings | Filing unit on left side of room | -- | Drawer to right of sink | -- | Black drawer filing cabinet to left of entrance door |
PVC Fittings | -- | -- | -- | -- | White drawer drawers to left of entrance door |
PVC Pipe | -- | -- | -- | -- | Back right corner, next to shop door |
PVC Primer and Cement | Drawer to left of sink | -- | -- | ---- | Top shelf of storage unit to the left of entrance door |
Pressure Sensors | -- | -- | Drawer to right of sink |
| next Next to the white drawers, hanging near the door of B60 |
Solenoid Valves | Drawer labeled "Valves, Clamps" | -- | Drawer to right of sink | Drawer to right of distilled water station in back corner | White drawer to left of entrance door, bottom shelf |
Pumps | Cabinets to left of sink | -- | -- | -- | -- |
Turbidimeters | Cabinets to left of sink | -- | -- | -- | -- |
RS 485 cables | -- | -- | -- | -- | Blue cabinet 1-- |
RS 485 to 232 converter | Filing unit on left side of room | -- | -- | -- | -- |
pH Probes, dissolved oxygen meters, temperature probes | -- | -- | -- | Hanging on wall next to fume hood | -- |
Relay boxes | -- | -- | -- | --Blue cabinet 3 | White drawer to the left of the entrance, 5 shelf from the bottom on the right |
Extension cords, power strips | -- | -- | -- | -- | Blue cabinet 3-- |