Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Spring 2015 Contributions

As a new team member, my goal is to work closely with my fellow team members to improve the drawing This semester, I worked as a member of the Design-Chemical Dose Controller Design team. My team's task was to improve the Chemical Dose Controller's design code used in our Automated Design Tool. As per March 2015, I had modified modified the drawing code for the Chemical Storage Tanks Platform and has re-positioned the Constant Head Tanks such that it drew out the walls around the platform. Additionally, I changed the drawing function of the stairs, so that it did not appear over-sized in the plant drawing. I will keep working on the drawing functions for the CDC and finalize the drawing for the lever arm. also modified the Constant Head Tanks drawing functions and redefined their origins variables such that their sizes and positions would be represented in the plant drawing correctly. Efforts were also made fix the orientation of the lever arms.