Sara, Kevin and Dave went down to the plant to work on the tank modifications. Kevin and Tom worked on installing the flow-meter, while Sara and Dave prepared the support set up for the flow control device. The bracing system is almost done, but we now need to make some modifications to the flow control bucket to make sure spilling does not occur. The flow-meter will require more work, but significant progress was made on it today.   

March 6, 2008

Rebecca developed a data analysis method, working with mathCAD programs used in previous semesters by Carol Serna.

March 8, 2008
Sara, Dave and Kevin meet to work on the Sedimentation tank design. Ran existing programs and also created new program to back calculate design for the existing tank size. Emailed Chris to learn more about optimum sludge blanket thickness, relationship of the sludge blanket and the lamella.

...