This summer I was a part of the design team. My task was to complete two drawings, one for a new stock tank mixer and the other for new spacers in the stacked rapid sand filter. I wrote code that would integrate these new pieces into the existing AutoCAD drawings.

Fall 2013 Contributions

I updated the sedimentation tank code by adding in design details, such as support structures to the inlet manifold and shifting the inlet jet over.

Spring 2014 Mid-Semester Contributions

I am merging May's sedimentation tank code and the current sedimentation tank code to form a cohesive code. I am also adding more support structures, ensuring the inlet manifold enters at 90 degrees, and altering the emergency drainage pipe code.