Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This semester, I am focusing on improving the current [Demo Plant|], eliminating some present failures. The main tasks for the semester are eliminating the flocculator overflow; increasing the capacity of stock tanks to achieve a continuous run time between 30-60 minutes; and updating the plant frame for ease-of-use during set-up and break-down.